Friday, October 31, 2008
today we took advantage of the warm weather
and caulked all the windows along with a host of
of other things inside
Thursday, October 30, 2008
putting in the last of the cupboards
preparing the sheet
metal for the heating system
finally the siding is done
Tuesday, October 28, 2008
Just a bit more siding to do then the
outside work will be done
bathroom tiling and grouting is done as
well as some other jobs were done today
Monday, October 27, 2008
today we celebrated another birthday
a lot of different things were done today
some tiling
kitchen cupboards were installed
racking for the closets
even a bit of siding got done
Thursday, October 23, 2008
Todays KPMG Group
Cutting the trim for the baseboard and
window casings
hydro was here to connect the services
electricians were connecting recepticals and lights
pavers were here to do the driveways
Tuesday, October 21, 2008
braving the cold so that we may enjoy
our lunch
today the group was from KPMG
putting down the laminate flooring
comon it's got to fit
enjoying our coffee break out of the cold
also hanging some doors
Monday, October 20, 2008
the mcap group
installing the doors
and the flooring
Friday, October 17, 2008
today was flooring day
line up to get the flooring cut
it also was painting the doors and trim day
Thursday, October 16, 2008
today was a day to put the finishing coat
on the walls as well as some other jobs
our happy painters
taking the scaffolding down
cutting the underlay
getting the doors ready for spray painting
Wednesday, October 15, 2008
running some wires to the units
painting the walls
blowing in the insulation
our latest acquisition
the siding saga continues
Tuesday, October 14, 2008
today was a day for priming the walls
tapeing the walls to hang the plastic
so the ceilings can be sprayed
some plumbing was done today
spraying the ceilings
Thursday, October 9, 2008
Site is closed down for Thanksgiving
playing in the water
moving on up with the shakes
all that is left of this person after a hard days work
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)
music
autostart=”false” height=”40″ loop=”true” playcount=”2″ src=” http://www.zshare.net/audio/745164122438365e/” width=”300″/
People Having a Peek at the Build Site
satellite tv deals
Cherry Street Build 2009
Cherry Street Site Map
Habitat for Humanity Waterloo Region
Blog Archive
▼
2008
(163)
►
December
(4)
►
November
(10)
▼
October
(17)
today we took advantage of the warm weatherand cau...
putting in the last of the cupboardspreparing the ...
Just a bit more siding to do then the outside work...
today we celebrated another birthday
Todays KPMG GroupCutting the trim for the baseboa...
braving the cold so that we may enjoyour lunchtoda...
the mcap groupinstalling the doors
today was flooring dayline up to get the flooring cut
today was a day to put the finishing coat on the w...
running some wires to the unitspainting the walls
today was a day for priming the walls
Site is closed down for Thanksgiving
playing in the watermoving on up with the shakes
This is all we did today.Had a picnicCelebrated a ...
all the sanding of the walls should be done todayg...
I'm so happy playing with the mud
drywalling, taping and mudding the garages
►