Monday, December 22, 2008















Follow our 2009 Cherry Street Build at

http://cherrystreet2009.blogspot.com/

Tuesday, December 2, 2008

Merry Christmas and all the best to everyone in the new Year 
See you at the 09 build season when again we will start a new blog
This will probably be the last update to the blog
for this year. There is only a little bit of cleanup
to do in the units before occupancy.
Occupancy inspection was done today
and all passed. Thanks to all the volunteers.

Monday, December 1, 2008

The end is near. Cleaning up the garages and
doing some small touchups

Wednesday, November 26, 2008

the heat is on

Monday, November 24, 2008

Things are starting to wind down.
trim around the staircases
a bit of plumbing to do yet
putting on the pulls for the cabinets

Thursday, November 20, 2008

still pluging away at the stairs
counter tops have all been fastened down and
tile back splash has been put in
exhaust pipes for the heating systems are
being put in

Tuesday, November 18, 2008

Getting ready to install the stairs
up she goes
hold it there
set in place

Monday, November 17, 2008

The snow has pretty well curtailed any other
work outside, not that there is much else to do.
The top of the windows have been completed
The furnaces and plumbing are
continuing along
landings for the stairs are being put in as
well as other touch ups being done

Tuesday, November 11, 2008

this is the work that was done on Monday
as well as laying of most of the sod
the last of the sod was layed today as well
as some inside work being completed

Friday, November 7, 2008

today was a day to do some cleanup tasks
get ready for the dedication on Saturday

Thursday, November 6, 2008

todays group was from WRPS
there was a lot of shoveling and moving
of the gravel today
today saw the porches and the sidewalk poured

Wednesday, November 5, 2008

Another nice fall day.
The sod was delivered today along
with the topsoil for the lawns
the ladies from Global Village were her today
to help with the landscaping
first job was taking down the scaffolding
it was a day of shovelling and
moving the ground

Tuesday, November 4, 2008

Another warm day to take advantage of some
outdoor work.
fixing some siding issues
installing bathroom hardware
cutting the holes for the heating system
\
laying down the floors
making the cuts for the stairs

Friday, October 31, 2008

today we took advantage of the warm weather
and caulked all the windows along with a host of
of other things inside

Thursday, October 30, 2008

putting in the last of the cupboards
preparing the sheet
metal for the heating system
finally the siding is done

Tuesday, October 28, 2008

Just a bit more siding to do then the
outside work will be done
bathroom tiling and grouting is done as
well as some other jobs were done today

Monday, October 27, 2008

today we celebrated another birthday
a lot of different things were done today
some tiling
kitchen cupboards were installed
racking for the closets
even a bit of siding got done