Monday, September 29, 2008

Getting the garage roof on before the rains come
at the end of the day
the mudders and tapers are here so it will be a
quiet week or two for all of us.
only a skeleton staff here

Friday, September 26, 2008

todays crew
wrapping the house
ghetting ready for the siding
finishing the window casings
just hanging out
putting on the corner bead
the tapers and mudders are here

Thursday, September 25, 2008

todays drywalling group

Tuesday, September 23, 2008

today was another drywalling day
cutting some tub covers
framing the garage doors
spraying the insulation in the garages

Monday, September 22, 2008

Measuring and cutting the siding
today we had a great
group doing the siding and drywalling
part of todays siding crew
moving the platforms
putting up the facia
done at the end of the day
the drywalling crew

Saturday, September 20, 2008

Today we had a group from Maple Leaf Foods
out to help.
It was a day of drywalling
for everyone
for lunch it was burgers and sausages

Friday, September 19, 2008

Today was mostly a drywall day from hoisting it up
to the second level and putting it in the lower level.
attaching the drywall
attaching the vapour barrier
connecting the meters
starting on the siding

Thursday, September 18, 2008




the drywall has arrived
up she goes
drywall in upstairs of one unit
flex pipes going in and taking a break
cutting the insulation
painting the gas pipes

working on the siding
and at the end of the day