It was a busy day for a lot of people
doing different jobs.
The shingles were hoisted onto the roof.
The siding on the end unit was started
The electricians were in as well as
heating pipes were installed.
Holes for the vent pipes were cut in the roof.
insulation was put in
Doors were put in.
The garage roofs were worked on.
Running the wiring.
Shingling
at the end of the day
end unit
from the back of the units
and the front